Look beyond the finish
A new covering still needs sound details underneath.
The covering, decking, underlayment, flashing, penetrations, edges, and drainage form a connected assembly. Tear-off provides an opportunity to examine the exposed deck before new layers conceal it. We can coordinate deck repairs and adjoining construction within the agreed scope; structural concerns may need professional review. Identify whether fascia, skylights, gutters, attic insulation, or interior water-damage repairs belong in this project rather than assuming they are included with the roofing.
Scope, schedule, and cost factors
Roof size, slope, access, existing layers, material choice, and repairs around penetrations affect the proposal. Weather, inspections, deliveries, and conditions uncovered during removal affect sequencing. Compare removal and disposal, repair allowances, and temporary weather protection alongside the new covering. If solar panels are present, discuss access, removal and reinstallation responsibilities with the appropriate solar provider before roofing is scheduled.