Look beyond the finish
The tile is the finish. Water management is the construction.
Tile and grout alone are not the waterproofing system. A shower needs a coordinated substrate, waterproofing assembly, drain connection, and details at corners, niches, benches, and penetrations. We plan plumbing, ventilation, electrical work, and finishes together. Identify water testing, inspections, and curing stages before finishes conceal the work. Product compatibility and installation instructions matter; familiar parts do not automatically create a suitable assembly.
Scope, schedule, and cost factors
A tub-to-shower conversion differs from moving the toilet, enlarging the room, or creating a curbless entry. Drain size, trap and vent arrangements, plumbing access, and floor construction need checking rather than assuming a shower can reuse the tub connection. Hidden water damage, tile layout, custom glass, and fixture availability affect the proposal. Inspections, waterproofing, curing, and fabrication belong in the sequence—not a standard completion promise.